Modular linear parking for residential developments: 96 spaces, three independent lifts, six storage levels and separate ground-level bays. The evaluated arrangement has a 485.82 m² operational footprint. The system is in engineering development; figures are preliminary, not certified specifications.
Contact us for more information about this product.
Sespel automated parking systemImportant: the Sespel parking system shown here is an engineering proposal, not a completed facility or a series-produced product. The top gallery contains computer-generated views of circular towers and individual mechanisms. The 96-space layout selected for further development is linear; its diagrams and design estimates are provided below. The complete vehicle-transfer path and support stiffness require redesign and verification before manufacturing.
Sespel automated parking is intended as a multi-level vehicle storage solution for residential developments. The driver leaves the vehicle in a ground-level arrival bay. Once its parameters are checked, the planned automation moves it to a storage level. A separate ground-level bay is provided for retrieval, without drivers travelling up ramps or through parking floors.
The figures refer to one preliminary option evaluated on 8–9 October 2026. They are not universal certified specifications and must be refined after site investigation, detailed engineering and project approvals.
The layout comprises two storage rows across six levels. Each of the three modules has its own lift: two modules hold 36 vehicles each and the third holds 24. Arrival and retrieval bays are positioned on opposite sides at ground level. This arrangement limits shared transport mechanisms and allows modules to be serviced independently.

Linear 36 + 36 + 24 arrangement with three lifts and six levels (preliminary presentation, p. 4)

Separate arrival and retrieval bays for each module (presentation, p. 6)

How 60 spaces may remain available when a 36-space module stops (presentation, p. 8)

Proposed 25.8 × 20.1 m arrangement and 25.5 m height (presentation, p. 12)
The transfer concept uses stationary shelf teeth and a movable comb on the carriage: relative movement transfers support under the wheels between carriage and shelf. This illustrates the principle only. Wheel contact geometry, safe bay flooring, drive assemblies and a continuous transfer path have not yet completed engineering verification.

Driver journey: drop off, confirm acceptance and retrieve from a separate bay (presentation, p. 2)

Comb transfer concept — computer-generated images, not a validated mechanism (presentation, p. 18)
These are preliminary design-model acceptance criteria, not approved operating instructions. A car meeting the overall size and mass limits is not necessarily eligible: axle position, tyre width and the load on each wheel also matter. The arrival bay requires interlocks that prevent machinery operation while people are present.

Vehicle envelope and mass limits for the evaluated layout (presentation, p. 5)
The technical report compares layouts using repeated mixed-demand simulations. At 30 operations per hour, the mean of simulated 95th-percentile readiness times is 6.67 minutes with three lifts versus 10.55 minutes with two. At 50 operations per hour, the three-lift design has a simulated mean P95 of 10.53 minutes. These are model results, not guaranteed retrieval times or certified throughput.

Simulated comparison of two and three lifts; actual retrieval time is not guaranteed (presentation, p. 7)
For the same 96 spaces and vehicle class, the selected mechanical arrangement has a 485.82 m² operational footprint. The comparison concrete ramp option uses 574.91–576.58 m², a calculated reduction of 15.50–15.74% under the study assumptions. The automated building bounding rectangle occupies 518.58 m², while the example plot including access lanes is about 1,338 m². These are different measures, and the percentages do not apply to every site.

Footprint comparison for 96 spaces — valid only for the evaluated designs (presentation, p. 3)
The baseline structural concept uses a steel frame with repeatable profiles and factory-fabricated sections. The proposed process includes plate cutting, edge preparation, welding, straightening, inspection, machining, coating and assembly on site. The engineering proposal envisages manufacturing major metal components at Sespel, while drives, brakes, bearings and safety devices would be specified and sourced to meet technical requirements.

Proposed manufacturing and installation: factory sections, assembly and commissioning (presentation, p. 11)

Photos of Sespel manufacturing facilities, not photos of the parking system (presentation, p. 9)

Computer-generated steel frame detail, not a production drawing (presentation, p. 16)
The engineering report dated 9 October 2026 identifies two essential issues: shelf-support flexibility exceeds the design limit, and a continuous path for the transfer carriage across supports has not been verified. The layout has therefore been selected for further development but is not ready for manufacturing, installation or use. Frame stability, full-cycle mechanism durability, safety interlocks and regulatory compliance also require verification.
To prepare a site-specific proposal we need a site plan with approaches and constraints, the target capacity, height limits, vehicle class and size, expected arrival and retrieval demand, ground and utility information, and facade requirements. These inputs allow initial evaluation of feasibility, the number of independent mechanisms and the scope of subsequent engineering. The figures on this page do not replace detailed design or a commercial quotation.
Source documents: “Automated Parking”, Sespel preliminary presentation dated 8 October 2026; “96-Space Parking”, technical summary dated 9 October 2026; and “96-Space Automated Parking: Structural and Manufacturing Design Selection”, technical report dated 9 October 2026. Linear-layout diagrams and technical comparisons are excerpts from the preliminary presentation.
Credits for the existing 3D visualisations: parking geometry by Sespel; Ferrari 458 Italia by vicent091036, BMW M4 CS by eldaaar and Mini Cooper S by kowalski_30 (CC BY 4.0); Poly Haven environment by James Ray Cock, Greg Zaal and Jarod Guest (CC0). Full credits and links: /images/production/parking/automated-parking/credits.txt.
Answers about capacity, vehicle acceptance, module arrangement, simulated retrieval time and development status.
No. It is a preliminary engineering proposal. The selected 96-space linear scheme still requires redesigned shelf supports and validation of the full vehicle-transfer path. Series-production readiness is not claimed.
Circular towers and entry areas are computer-generated illustrations of the operating concept. The specification figures refer to a separate 36 + 36 + 24 linear arrangement shown in the technical diagrams below.
The chosen layout has 96 spaces in three modules with 36, 36 and 24 spaces. Each module has a separate lift, transfer carriage, ground-level arrival bay and retrieval bay.
The design class covers up to 3,000 kg actual mass and 5,300 × 2,300 × 2,200 mm including mirrors and roof items. Tyres, tracks, wheelbase, weight distribution and positioning must also be checked; envelope dimensions alone are insufficient.
In the proposed workflow, the driver leaves the car at ground level, confirms acceptance and exits the bay. Automated mechanisms are intended to store it on a shelf and return it to a separate retrieval bay on request.
At a simulated demand of 30 operations per hour with three lifts, the average P95 vehicle readiness time is 6.67 minutes. This is not a guarantee: demand, queues and request patterns change the result.
In the study comparison, the operational footprint is 485.82 m² versus 574.91–576.58 m², a 15.50–15.74% reduction under equal 96-space capacity and the stated assumptions. Savings in overall site area are evaluated separately and are not guaranteed for every development.
If a 36-space module stops, the other 60 spaces may remain available provided shared systems are operational. Vehicles in the stopped module are not automatically moved into other modules.
No. EV and plug-in hybrid charging is not included in the described configuration. Storage rules, fire protection and restrictions for those vehicles require a separate project.
The proposed building envelope is 25.80 × 20.10 m and the height is 25.54 m. The operational footprint is 485.82 m², but the total plot must also include access and queuing; approximately 1,338 m² was used in the model.
The proposal envisages in-house production of main structural profiles, beams, shelves and repeatable sections for on-site assembly. Drives, brakes, bearings and safety devices would be sourced externally. The manufacturing process remains subject to validation.
Provide the site plan and access roads, required capacity, height limits, vehicle classes and dimensions, expected traffic, utility and geotechnical information, and facade requirements. This supports comparison of alternatives and definition of detailed engineering needs.